Director, AI Datacenter Construction at Bitdeer Technologies Group | Austin, TX, US | Rezi

Director, AI Datacenter Construction at Bitdeer Technologies Group

Director, AI Datacenter Construction

Bitdeer Technologies Group · Austin, TX, US

2 days ago

Director, AI Datacenter Construction

Bitdeer Technologies Group · Austin, TX, US

3 days ago
Resume preview

Impress employers and recruiters.
Choose from hundreds of resume examples.

Target Resume Now
Resume preview

Tailor your resume to this Director, AI Datacenter Construction role.

Rezi rewrites your resume against Bitdeer Technologies Group's job description. Free.

Resume score gauge reading 58 out of 100

Don't guess if your resume is good enough.

See how it scores against the Director, AI Datacenter Construction posting at Bitdeer Technologies Group — free, in seconds.

About the Role

We are seeking a Director, AI Datacenter Construction to lead the delivery of multiple concurrent AI data center builds across Bitdeer’s U.S. portfolio. You will own construction execution for high-density AI campuses, new builds, and retrofits, from site diligence and design through energization, commissioning, and turnover to operations, with accountability for safety, schedule, cost, and quality. You will lead site construction managers and discipline leads, set one delivery playbook across all builds, and manage general contractors, utility partners, and design consultants.

Responsibilities

  • Lead construction of multiple concurrent AI data center builds, from site diligence and design through energization, commissioning, and ready-for-service (RFS).
  • Build, lead, and mentor site construction managers, project managers, and discipline leads, and help recruit hyperscale-experienced talent as the portfolio grows.
  • Standardize construction processes, playbooks, and reporting across sites.
  • Lead multidisciplinary reviews of design packages to resolve constructability, cost, and schedule issues.
  • Coordinate substation interconnection, utility and EPC partners, outage planning, and energization milestones.
  • Resolve easement, land, and permitting constraints.
  • Execute across self-build, build-to-suit, and colocation/third-party delivery models, including tenant fit-outs.
  • Deliver direct-to-chip liquid cooling and high-density power distribution for GPU/AI workloads.
  • Coordinate base-building construction with network, fiber, and rack deployment teams.
  • Plan and execute retrofits and conversions of existing facilities into AI-ready capacity.
  • Own site budgets, Estimate at Completion (EAC) forecasts, owner’s contingency, and value engineering across the portfolio.
  • Review and approve contractor change orders and scope changes.
  • Select and manage general contractors, electrical contractors, trade partners, and consultants.
  • Direct procurement of long-lead equipment and structural steel.
  • Support Site-Specific Owner Project Requirements (SSOPR) negotiations with hyperscale and AI tenants.
  • Set commissioning frameworks that protect schedule and RFS dates.
  • Set clear communication protocols between Bitdeer, tenants, and contractors.
  • Lead site visits for prospective tenants and investors.
  • Report status, risks, and decision options to executive leadership.
  • Enforce a zero-harm safety culture, including OSHA compliance, Method of Procedure (MOP), Lockout/Tagout (LOTO), and energization safety in live environments.
  • Run QA/QC programs, root cause failure analysis (RCFA), and Level 1–5 commissioning.
  • Deliver structured closeout and digital asset handover to operations and client CMMS platforms.
  • Oversee incentive and labor compliance (e.g., IRA/ITC, prevailing wage and apprenticeship).

Requirements

  • 12+ years in data center, mission-critical, or large-scale construction.
  • 5+ years leading owner-side hyperscale or AI data center construction.
  • Proven delivery of multiple concurrent builds or multi-building campuses totaling 300MW+ of critical capacity, with capital budgets of $1B+.
  • Hands-on delivery of AI/ML-ready, high-density, or liquid-cooled data centers, including direct-to-chip cooling.
  • Experience across self-build, colocation, and third-party data center delivery, including tenant fit-outs.
  • Working knowledge of civil, structural, electrical, and mechanical systems, MV/HV power distribution, substation interconnection, and Level 1–5 commissioning.
  • Strong command of EAC forecasting, owner’s contingency, change-order control, value engineering, and OFCI procurement.
  • Track record of building standard construction processes and playbooks across multiple regions or programs.
  • Experience working with jurisdictions, inspectors, and building codes.
  • Leads from the field, develops construction managers, and builds disciplined, accountable teams.
  • Holds firm in tenant and contractor negotiations while keeping relationships productive.
  • Aligns engineering, operations, finance, tenants, utilities, and local authorities around one plan.
  • Holds the line on safety and quality while delivering at speed.

Skills

  • AI
  • Bitcoin mining
  • Data center construction
  • Liquid cooling
  • Direct-to-chip cooling
  • High-density power distribution
  • GPU/AI workloads
  • Civil engineering
  • Structural engineering
  • Electrical engineering
  • Mechanical engineering
  • MV/HV power distribution
  • Substation interconnection
  • Commissioning (Level 1-5)
  • Estimate at Completion (EAC) forecasting
  • Owner's contingency management
  • Change-order control
  • Value engineering
  • Owner-Furnished, Contractor-Installed (OFCI) procurement
  • Construction process standardization
  • Playbook development
  • Jurisdictional experience
  • Permitting
  • Negotiation
  • Stakeholder alignment
  • Safety management
  • Quality assurance/Quality control (QA/QC)
  • Root Cause Failure Analysis (RCFA)
  • OSHA compliance
  • Method of Procedure (MOP)
  • Lockout/Tagout (LOTO)
  • Prevailing wage and apprenticeship compliance

Location

  • United States

Work Type

  • Full-time

Experience Level

  • Director
  • 12+ years
  • 5+ years

Education Level

  • Bachelor’s degree in Civil, Structural, Electrical, Mechanical, or Architectural Engineering, Construction Management, or a related field, or equivalent experience.
  • Professional certifications such as PE, PMP, OSHA 30/40-Hour, or LEED.

Benefits

  • Attractive benefits
  • Training
  • Mentoring

About the Company

  • Bitdeer is a world-leading technology company for AI and Bitcoin mining infrastructure.
  • Bitdeer is committed to providing comprehensive Bitcoin mining solutions for its customers and building AI computational infrastructure to support the AI revolution.
  • Bitdeer handles complex processes involved in computing such as equipment procurement, transport logistics, data center design and construction, equipment management, and daily operations.
  • Bitdeer also offers advanced cloud capabilities to customers with high demand for artificial intelligence.
  • Headquartered in Singapore, Bitdeer has deployed data centers across multiple countries, including the United States, Norway, Bhutan, and Ethiopia.

Equal Opportunity

  • Bitdeer is committed to providing equal employment opportunities in accordance with country, state, and local laws.
  • Bitdeer does not discriminate against employees or applicants based on conditions such as race, color, gender identity and/or expression, sexual orientation, marital and/or parental status, religion, political opinion, nationality, ethnic background or social origin, social status, disability, age, indigenous status, and union.