Supervisor - Electrical at Acciona | AU | Rezi

Supervisor - Electrical at Acciona

Supervisor - Electrical

Acciona · AU

1 months ago

Supervisor - Electrical

Acciona · AU

a month ago
Resume preview

Impress employers and recruiters.
Choose from hundreds of resume examples.

Target Resume Now
Resume preview

Tailor your resume to this Supervisor - Electrical role.

Rezi rewrites your resume against Acciona's job description. Free.

Resume score gauge reading 58 out of 100

Don't guess if your resume is good enough.

See how it scores against the Supervisor - Electrical posting at Acciona — free, in seconds.

About the Role

This role involves supervising the electrical installation of substations for one of the country's largest transmission builds, ensuring work is completed safely, to specification, and right the first time.

Responsibilities

  • Supervising the electrical installation of substations across the project, from equipment set-out through to handover
  • Ensuring all electrical works conform to the specification, relevant standards and code of practice, and that hold and witness point actions are done before work starts
  • Adopting a zero tolerance to work practices and equipment that may be unsafe or carry serious adverse safety or environmental impact
  • Preparing safe work method statements and JSA cards alongside work crews, then making sure the controls are implemented and reviewed regularly
  • Leading subcontractors positively, monitoring their performance and holding the standard of workmanship
  • Recording non-conformances, initiating corrective actions and prioritising close-out of outstanding defects with the project team

Requirements

  • 5+ years' experience supervising electrical installation works, or managing electrical trade packages, on major projects
  • Previous experience working in high voltage environments
  • A working knowledge of HS&E and regulatory requirements, and how to implement them on the ground
  • Clear communication, verbal and written, with the ability to give plain direction to construction workers
  • Supervised substation installation before and know what it takes to get it in safely and to specification
  • Read drawings confidently
  • Hold subcontractors to the standard
  • Plan work so it lands on schedule

Skills

  • Electrical installation supervision
  • Substation installation
  • High voltage environments
  • HS&E and regulatory requirements
  • Communication (verbal and written)
  • Reading drawings
  • Subcontractor management
  • Work planning

Location

  • Central West Orana Region

Work Type

  • Bus in, bus out
  • Camp style accommodation provided
  • Roster-based arrangement

Experience Level

  • 5+ years

Benefits

  • Camp style accommodation provided for 14 days onsite and 7 days off site

About the Company

  • ACCIONA is a global company leading in the development of regenerative infrastructure.
  • ACCIONA's workforce consists of more than 65,000 professionals in over 40 countries.
  • ACCIONA's mission is to design a better planet and find solutions to global challenges.
  • COBRA is an 80-year group promoting its own efficient business model.
  • COBRA has over 20,000 professionals in more than 43 countries.
  • COBRA offers a wide range of services throughout the value chain of projects.
  • COBRA is divided into four main sectors: Networks, Specialised installations, integrated projects and concession assets.
  • ACEREZ is a partnership of ACCIONA, COBRA and Endeavour Energy.
  • ACEREZ has been appointed network operator by EnergyCo to design, build, finance, operate and maintain the Central-West Orana Renewable Energy Zone (REZ) transmission network.
  • The ACCIONA COBRA Joint Venture (ACJV) will design and build the Central-West Orana REZ transmission project.
  • The Central-West Orana Renewable Energy Zone (REZ) Transmission Project will build new high-capacity transmission lines, energy hubs and supporting infrastructure.
  • The new infrastructure is expected to be operational by 2028 and will initially unlock up to 4.5 gigawatts of new network capacity.
  • The project consists of 90km of 500kV overhead transmission lines and 150 km of 330kV transmission lines.
  • ACCIONA has been given the Top Employer 2022, 2023, 2024 & 2025 certification in Australia.
  • ACCIONA has made significant investments in local opportunities and project development in Australia since 2002.
  • ACCIONA employs more than 3,000 people in its renewable energy, infrastructure and water projects across Australia & New Zealand.

Equal Opportunity

  • We welcome applicants of all backgrounds, identities, and experiences.
  • We are an Equal Opportunity Employer and promote equality and diversity.
  • Indigenous Australians and candidates from minority groups are encouraged to apply.